Aluminum Scaffold Plank

Has hook type 2 plank and OSHA requires all work levels to be completely decked. In addition, be sure to properly inspect all planks/platforms before installing, and once installed, check for proper overlay of the planks.

For safety, we recommend 3 planks that creates a full deck across 1 section. We do realize that some customer have their own planks and choose to use their own.